1569954055:629455 |
629455 629455 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:06:20 UTC |
October 02, 2019 - 05:00:00 UTC |
|
1 |
0 |
40.55785 |
-124.14553 |
Fortuna 9 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:630055 |
630055 630055 |
2019-10-01 11:20:55-07:00 69 |
September 30, 2019 - 15:29:50 UTC |
October 02, 2019 - 23:00:00 UTC |
|
1 |
0 |
38.12243 |
-121.83043 |
Rio Vista 21 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:631014 |
631014 631014 |
2019-10-01 11:20:55-07:00 69 |
September 30, 2019 - 17:04:42 UTC |
October 03, 2019 - 21:30:00 UTC |
|
1 |
0 |
39.0775 |
-121.52568 |
Olivehurst 17 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:632633 |
632633 632633 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:19:44 UTC |
October 02, 2019 - 01:00:00 UTC |
|
1 |
1 |
38.37341 |
-121.54748 |
Clarksburg 5 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633373 |
633373 633373 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:20:03 UTC |
October 01, 2019 - 23:46:00 UTC |
|
1 |
0 |
38.36723 |
-121.54198 |
Clarksburg 5 |
Our preliminary determination is that your outage was caused by an emergency issue. 4 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633433 |
633433 633433 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:53:25 UTC |
October 01, 2019 - 19:00:00 UTC |
|
1 |
0 |
38.65738 |
-121.77805 |
Woodland 34 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E is sending a repair crew to the outage location. 3 |
1569954055:633488 |
633488 633488 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:14:10 UTC |
October 02, 2019 - 01:00:00 UTC |
|
27 |
1 |
35.99202 |
-119.57146 |
Kettleman City 10 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633516 |
633516 633516 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:40:59 UTC |
October 01, 2019 - 20:59:00 UTC |
|
41 |
1 |
35.52131 |
-120.71256 |
Atascadero 40 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633524 |
633524 633524 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:53:00 UTC |
October 01, 2019 - 22:00:00 UTC |
|
94 |
0 |
37.29072 |
-121.95844 |
Campbell 43 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633540 |
633540 633540 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:29:48 UTC |
October 01, 2019 - 21:00:00 UTC |
|
19 |
0 |
35.58976 |
-120.83334 |
Paso Robles 48 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633542 |
633542 633542 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 18:14:28 UTC |
October 01, 2019 - 18:45:00 UTC |
|
14 |
0 |
36.99019 |
-121.73674 |
Watsonville 49 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E repair crew is en route to the outage location. 7 |
1569954055:633545 |
633545 633545 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 13:07:00 UTC |
October 01, 2019 - 21:30:00 UTC |
|
4 |
0 |
35.64097 |
-120.84891 |
Paso Robles 48 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633546 |
633546 633546 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:32:51 UTC |
October 01, 2019 - 22:37:00 UTC |
|
20 |
0 |
37.87055 |
-122.03021 |
Walnut Creek 33 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E is sending a repair crew to the outage location. 3 |
1569954055:633547 |
633547 633547 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:05:33 UTC |
October 01, 2019 - 23:00:00 UTC |
|
4 |
0 |
41.17032 |
-121.68866 |
Burney 50 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633548 |
633548 633548 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:37:29 UTC |
October 01, 2019 - 21:30:00 UTC |
|
1 |
0 |
34.93489 |
-120.45556 |
Santa Maria 52 |
PG&E is investigating the cause of your outage. 6 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:633549 |
633549 633549 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:36:18 UTC |
October 01, 2019 - 22:00:00 UTC |
|
3 |
0 |
37.29066 |
-121.95854 |
Campbell 43 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633550 |
633550 633550 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 14:22:00 UTC |
October 02, 2019 - 00:00:00 UTC |
|
1 |
0 |
36.13872 |
-120.12345 |
Huron 51 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633551 |
633551 633551 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 14:22:00 UTC |
October 02, 2019 - 00:00:00 UTC |
|
1 |
0 |
36.13871 |
-120.12345 |
Huron 51 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633552 |
633552 633552 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 14:22:00 UTC |
October 02, 2019 - 00:00:00 UTC |
|
1 |
0 |
36.13868 |
-120.12345 |
Huron 51 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633572 |
633572 633572 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:36:11 UTC |
October 01, 2019 - 21:30:00 UTC |
|
1 |
0 |
37.72031 |
-122.38494 |
San Francisco 25 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633573 |
633573 633573 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:45:57 UTC |
October 01, 2019 - 23:00:00 UTC |
|
28 |
0 |
38.84408 |
-122.20342 |
Guinda 59 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633575 |
633575 633575 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:35:36 UTC |
October 01, 2019 - 21:00:00 UTC |
|
35 |
1 |
35.50372 |
-120.53148 |
Creston 58 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E is sending a repair crew to the outage location. 3 |
1569954055:633581 |
633581 633581 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:16:08 UTC |
October 01, 2019 - 22:00:00 UTC |
|
1 |
0 |
35.51321 |
-120.70711 |
Atascadero 40 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633582 |
633582 633582 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:35:18 UTC |
October 02, 2019 - 01:33:00 UTC |
|
1 |
0 |
38.72181 |
-121.83119 |
Woodland 34 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E is sending a repair crew to the outage location. 3 |
1569954055:633586 |
633586 633586 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:12:01 UTC |
October 01, 2019 - 19:00:00 UTC |
October 01, 2019 - 19:00:00 UTC |
5 |
0 |
38.03178 |
-122.2639 |
Rodeo 65 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E is sending a repair crew to the outage location. 3 |
1569954055:633588 |
633588 633588 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:06:20 UTC |
October 01, 2019 - 18:15:00 UTC |
October 01, 2019 - 18:15:00 UTC |
1 |
0 |
38.50659 |
-122.76356 |
Larkfield-Wikiup 67 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633590 |
633590 633590 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:17:45 UTC |
October 02, 2019 - 00:00:00 UTC |
|
89 |
0 |
34.61365 |
-120.07835 |
Santa Ynez 68 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633598 |
633598 633598 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:10:59 UTC |
October 01, 2019 - 23:00:00 UTC |
|
1 |
0 |
36.92033 |
-119.96411 |
Madera 76 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633599 |
633599 633599 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:19:30 UTC |
October 01, 2019 - 21:30:00 UTC |
|
8 |
0 |
35.30304 |
-119.01307 |
Bakersfield 2 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633601 |
633601 633601 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:23:09 UTC |
October 01, 2019 - 21:00:00 UTC |
|
77 |
0 |
37.91753 |
-121.26085 |
Stockton 78 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633602 |
633602 633602 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:11:08 UTC |
October 02, 2019 - 03:00:00 UTC |
|
116 |
0 |
35.15721 |
-120.66906 |
Pismo Beach 18 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633606 |
633606 633606 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:09:32 UTC |
October 01, 2019 - 21:00:00 UTC |
|
1 |
0 |
36.81494 |
-120.08761 |
Kerman 61 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633613 |
633613 633613 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 18:13:06 UTC |
October 01, 2019 - 22:00:00 UTC |
|
4 |
0 |
40.68132 |
-122.18516 |
Bella Vista 71 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633619 |
633619 633619 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:36:38 UTC |
October 01, 2019 - 19:00:00 UTC |
|
3 |
0 |
38.81335 |
-122.99919 |
Cloverdale 81 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:633620 |
633620 633620 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 18:06:24 UTC |
|
|
1 |
0 |
37.7512 |
-122.4368 |
San Francisco 25 |
PG&E is investigating the cause of your outage. 6 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:633621 |
633621 633621 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:23:17 UTC |
October 01, 2019 - 21:00:00 UTC |
|
12 |
0 |
40.49104 |
-122.31006 |
Redding 85 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633624 |
633624 633624 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:26:57 UTC |
October 01, 2019 - 23:00:00 UTC |
|
9 |
0 |
34.95908 |
-120.51911 |
Santa Maria 52 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633635 |
633635 633635 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:26:59 UTC |
October 02, 2019 - 01:00:00 UTC |
|
42 |
0 |
37.74341 |
-122.46635 |
San Francisco 25 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633637 |
633637 633637 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:23:15 UTC |
October 01, 2019 - 17:30:00 UTC |
|
1 |
0 |
36.67996 |
-119.18248 |
Squaw Valley 94 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633640 |
633640 633640 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:23:21 UTC |
October 01, 2019 - 21:00:00 UTC |
|
2 |
0 |
36.60836 |
-119.64649 |
Fowler 89 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633641 |
633641 633641 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:27:37 UTC |
October 01, 2019 - 22:00:00 UTC |
|
8 |
0 |
35.49512 |
-120.67227 |
Atascadero 40 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633649 |
633649 633649 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:48:46 UTC |
October 01, 2019 - 18:45:00 UTC |
October 01, 2019 - 18:45:00 UTC |
1 |
0 |
38.40317 |
-122.51142 |
Glen Ellen 90 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E assessment crew is en route to the outage. 5 |
1569954055:633654 |
633654 633654 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:35:12 UTC |
October 01, 2019 - 22:00:00 UTC |
|
5 |
0 |
38.28927 |
-122.64573 |
Petaluma 96 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633656 |
633656 633656 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 18:14:02 UTC |
October 01, 2019 - 21:30:00 UTC |
|
1 |
0 |
37.97116 |
-122.34512 |
San Pablo 98 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633657 |
633657 633657 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:18:37 UTC |
October 01, 2019 - 21:00:00 UTC |
|
45 |
0 |
35.54397 |
-121.08472 |
Cambria 3 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633693 |
633693 633693 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:36:14 UTC |
October 01, 2019 - 21:00:00 UTC |
|
5 |
0 |
36.5109 |
-119.70258 |
Selma 100 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633713 |
633713 633713 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:48:37 UTC |
October 01, 2019 - 23:00:00 UTC |
|
3 |
0 |
37.96152 |
-121.7146 |
Brentwood 95 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633735 |
633735 633735 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:10:38 UTC |
October 01, 2019 - 23:00:00 UTC |
|
69 |
0 |
37.94995 |
-121.7083 |
Brentwood 95 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633753 |
633753 633753 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:49:10 UTC |
October 01, 2019 - 23:00:00 UTC |
|
43 |
0 |
38.21709 |
-122.63594 |
Petaluma 96 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633773 |
633773 633773 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:47:45 UTC |
October 01, 2019 - 20:15:00 UTC |
|
1 |
0 |
37.56931 |
-122.30385 |
San Mateo 29 |
PG&E is investigating the cause of your outage. 6 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:633774 |
633774 633774 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:47:46 UTC |
October 01, 2019 - 21:00:00 UTC |
|
1 |
0 |
38.64604 |
-120.97578 |
Cameron Park 101 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633775 |
633775 633775 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:59:15 UTC |
October 01, 2019 - 18:30:00 UTC |
October 01, 2019 - 18:30:00 UTC |
1 |
0 |
36.77528 |
-119.8636 |
Fresno 35 |
PG&E is investigating the cause of your outage. 6 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:633776 |
633776 633776 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:36:37 UTC |
October 01, 2019 - 21:30:00 UTC |
|
20 |
0 |
36.97009 |
-122.05138 |
Santa Cruz 104 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633777 |
633777 633777 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:47:52 UTC |
October 01, 2019 - 21:30:00 UTC |
|
10 |
0 |
38.45195 |
-121.82699 |
Dixon 45 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633778 |
633778 633778 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:14:26 UTC |
October 01, 2019 - 21:00:00 UTC |
|
5 |
0 |
39.26432 |
-123.23024 |
Redwood Valley 103 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633780 |
633780 633780 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 15:58:09 UTC |
October 01, 2019 - 23:00:00 UTC |
|
33 |
0 |
37.77511 |
-120.82238 |
Oakdale 102 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633783 |
633783 633783 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:17:17 UTC |
October 01, 2019 - 18:45:00 UTC |
October 01, 2019 - 18:45:00 UTC |
1 |
0 |
37.72426 |
-120.72623 |
Oakdale 102 |
PG&E is investigating the cause of your outage. 6 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:633785 |
633785 633785 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:08:12 UTC |
October 01, 2019 - 21:30:00 UTC |
|
34 |
0 |
39.21671 |
-120.79452 |
Alta 105 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633786 |
633786 633786 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:02:54 UTC |
October 01, 2019 - 19:00:00 UTC |
October 01, 2019 - 19:00:00 UTC |
1 |
0 |
35.93635 |
-121.1071 |
Lockwood 114 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633787 |
633787 633787 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:03:36 UTC |
October 01, 2019 - 22:00:00 UTC |
|
2 |
0 |
37.83808 |
-121.60433 |
Discovery Bay 110 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633789 |
633789 633789 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:05:22 UTC |
October 01, 2019 - 22:00:00 UTC |
|
6 |
0 |
40.49893 |
-122.37347 |
Anderson 106 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633790 |
633790 633790 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:08:18 UTC |
October 01, 2019 - 21:00:00 UTC |
|
22 |
0 |
39.23456 |
-121.1069 |
Nevada City 69 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633791 |
633791 633791 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:08:42 UTC |
October 01, 2019 - 22:00:00 UTC |
|
3 |
0 |
38.21274 |
-120.55908 |
Mountain Ranch 116 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633793 |
633793 633793 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:07:56 UTC |
October 01, 2019 - 21:00:00 UTC |
|
2 |
0 |
39.07694 |
-121.10733 |
Grass Valley 113 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633794 |
633794 633794 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:12:43 UTC |
October 01, 2019 - 23:00:00 UTC |
|
3 |
0 |
36.39417 |
-119.53801 |
Hanford 73 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633796 |
633796 633796 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:45:10 UTC |
October 01, 2019 - 21:30:00 UTC |
|
6 |
0 |
39.04242 |
-121.03184 |
Grass Valley 113 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633797 |
633797 633797 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:05:51 UTC |
October 02, 2019 - 00:00:00 UTC |
|
11 |
0 |
40.50248 |
-124.28154 |
Ferndale 112 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633798 |
633798 633798 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:05:51 UTC |
October 01, 2019 - 22:00:00 UTC |
|
44 |
0 |
38.37566 |
-122.71296 |
Santa Rosa 30 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633799 |
633799 633799 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:17:46 UTC |
October 01, 2019 - 23:00:00 UTC |
|
1 |
0 |
38.57662 |
-122.60338 |
Calistoga 108 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633800 |
633800 633800 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 18:15:55 UTC |
October 01, 2019 - 22:00:00 UTC |
|
31 |
0 |
38.31537 |
-123.02276 |
Bodega Bay 107 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633801 |
633801 633801 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:10:48 UTC |
October 02, 2019 - 00:00:00 UTC |
|
43 |
0 |
37.95149 |
-122.32156 |
East Richmond Heights 111 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633804 |
633804 633804 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:31:44 UTC |
October 01, 2019 - 19:15:00 UTC |
October 01, 2019 - 19:15:00 UTC |
5 |
0 |
40.38922 |
-122.26397 |
Cottonwood 56 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E is sending a repair crew to the outage location. 3 |
1569954055:633805 |
633805 633805 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:22:43 UTC |
October 01, 2019 - 19:30:00 UTC |
October 01, 2019 - 19:30:00 UTC |
1 |
0 |
40.38934 |
-122.264 |
Cottonwood 56 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633812 |
633812 633812 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:09:38 UTC |
October 01, 2019 - 22:00:00 UTC |
|
10 |
0 |
37.25054 |
-121.96414 |
Los Gatos 121 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633813 |
633813 633813 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:09:48 UTC |
October 01, 2019 - 22:00:00 UTC |
|
1 |
0 |
38.16742 |
-120.84556 |
Valley Springs 32 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633814 |
633814 633814 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:10:48 UTC |
October 02, 2019 - 00:00:00 UTC |
|
3 |
0 |
38.37292 |
-122.25529 |
Napa 15 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633816 |
633816 633816 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:16:43 UTC |
October 01, 2019 - 23:00:00 UTC |
|
12 |
0 |
39.00698 |
-123.41581 |
Philo 122 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633819 |
633819 633819 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 18:08:56 UTC |
October 01, 2019 - 22:00:00 UTC |
|
20 |
0 |
36.99591 |
-121.92331 |
Aptos 119 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633820 |
633820 633820 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:28:01 UTC |
October 01, 2019 - 19:15:00 UTC |
October 01, 2019 - 19:15:00 UTC |
1 |
0 |
39.73326 |
-122.12754 |
Orland 64 |
PG&E is investigating the cause of your outage. 6 |
PG&E is sending a repair crew to the outage location. 3 |
1569954055:633821 |
633821 633821 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 18:12:06 UTC |
October 01, 2019 - 19:00:00 UTC |
October 01, 2019 - 19:00:00 UTC |
1 |
0 |
37.34017 |
-121.99712 |
Sunnyvale 129 |
Our preliminary determination is that your outage was caused by an equipment issue. 2 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:633822 |
633822 633822 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:32:36 UTC |
October 01, 2019 - 23:00:00 UTC |
|
38 |
0 |
37.32107 |
-122.05454 |
Cupertino 123 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633823 |
633823 633823 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 18:09:06 UTC |
October 01, 2019 - 19:45:00 UTC |
October 01, 2019 - 19:45:00 UTC |
912 |
2 |
38.14012 |
-120.36972 |
MI Wuk Village 127 |
PG&E is investigating the cause of your outage. 6 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:633825 |
633825 633825 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:21:41 UTC |
October 02, 2019 - 00:00:00 UTC |
|
23 |
0 |
37.70608 |
-122.47673 |
Daly City 124 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633827 |
633827 633827 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:27:58 UTC |
October 02, 2019 - 00:00:00 UTC |
|
4 |
0 |
37.38808 |
-122.26323 |
Woodside 130 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633828 |
633828 633828 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:22:53 UTC |
October 01, 2019 - 18:30:00 UTC |
|
4 |
0 |
39.2778 |
-121.09047 |
Nevada City 69 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633830 |
633830 633830 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:33:36 UTC |
October 01, 2019 - 22:30:00 UTC |
|
3 |
0 |
38.25147 |
-122.73223 |
Petaluma 96 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633831 |
633831 633831 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:17:57 UTC |
October 01, 2019 - 18:30:00 UTC |
|
8 |
0 |
35.67104 |
-120.08167 |
Lost Hills 126 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633832 |
633832 633832 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:25:20 UTC |
October 02, 2019 - 01:00:00 UTC |
|
1 |
0 |
37.37484 |
-122.15912 |
Los Altos Hills 125 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633833 |
633833 633833 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:31:39 UTC |
October 01, 2019 - 20:00:00 UTC |
October 01, 2019 - 20:00:00 UTC |
1 |
0 |
37.72061 |
-121.43092 |
Tracy 38 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633835 |
633835 633835 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:41:13 UTC |
October 01, 2019 - 19:30:00 UTC |
October 01, 2019 - 19:30:00 UTC |
22 |
1 |
39.1815 |
-121.19624 |
Penn Valley 137 |
PG&E is investigating the cause of your outage. 6 |
PG&E is assessing the cause at the outage location. 4 |
1569954055:633836 |
633836 633836 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:31:38 UTC |
October 01, 2019 - 22:00:00 UTC |
|
10 |
0 |
37.9565 |
-121.31958 |
Stockton 78 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633837 |
633837 633837 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:44:19 UTC |
October 01, 2019 - 22:00:00 UTC |
|
79 |
0 |
37.37026 |
-121.80912 |
San Jose 26 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633839 |
633839 633839 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:32:29 UTC |
October 01, 2019 - 23:00:00 UTC |
|
25 |
0 |
36.61702 |
-119.27635 |
Orange Cove 136 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633840 |
633840 633840 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:01:00 UTC |
October 01, 2019 - 19:15:00 UTC |
October 01, 2019 - 19:15:00 UTC |
1 |
0 |
37.90914 |
-122.27613 |
Kensington 134 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633843 |
633843 633843 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:28:58 UTC |
October 01, 2019 - 19:00:00 UTC |
|
1 |
0 |
36.68014 |
-119.18197 |
Squaw Valley 94 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633844 |
633844 633844 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:01:21 UTC |
October 01, 2019 - 23:00:00 UTC |
|
12 |
0 |
37.37402 |
-121.8091 |
East Foothills 133 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633845 |
633845 633845 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:39:43 UTC |
October 01, 2019 - 19:00:00 UTC |
October 01, 2019 - 19:00:00 UTC |
1 |
0 |
37.77269 |
-122.20575 |
Oakland 16 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E assessment crew is en route to the outage. 5 |
1569954055:633846 |
633846 633846 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:04:00 UTC |
October 01, 2019 - 23:00:00 UTC |
|
38 |
0 |
38.32939 |
-122.31871 |
Napa 15 |
Our preliminary determination is that your outage was caused by scheduled maintenance work. 3 |
PG&E repair crew is on-site working to restore power. 2 |
1569954055:633847 |
633847 633847 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 16:32:01 UTC |
October 01, 2019 - 19:45:00 UTC |
October 01, 2019 - 19:45:00 UTC |
12 |
0 |
40.77789 |
-124.17367 |
Eureka 6 |
Unknown - PG&E will be assessing the cause. 1 |
PG&E has assigned a crew to assess the outage. 1 |
1569954055:633848 |
633848 633848 |
2019-10-01 11:20:55-07:00 69 |
October 01, 2019 - 17:50:16 UTC |
October 01, 2019 - 18:15:00 UTC |
October 01, 2019 - 18:15:00 UTC |
89 |
0 |
36.82208 |
-119.79917 |
Fresno 35 |
PG&E is investigating the cause of your outage. 6 |
PG&E is assessing the cause at the outage location. 4 |